2006
Yann Hendel Francis Sourd

We use the Akers-Friedman geometric approach to solve the two jobs job-shop problem when there is an earliness cost on the first operation and a tardiness cost on the last operation of each job. We then generalize the problem by imposing earliness and tardiness costs on each operation and finally, we solve it using a dynamic programming algorithm. KeywordsEarliness-tardiness scheduling, Polyn...

Journal: :Computers & Industrial Engineering 2005
S. Thiagarajan Chandrasekharan Rajendran

In many manufacturing systems, jobs that are completed early are held as finished-goods inventory until their due-dates, and hence we incur earliness costs. Similarly, jobs that are completed after their due-dates incur penalty. The objective in such situations would, therefore, be to meet the due-dates of the respective jobs as closely as possible, and consequently minimize the sum of earlines...

Journal: :Annals OR 2001
Mario Vanhoucke Erik Demeulemeester Willy Herroelen

In this paper we study the resource-constrained project scheduling problem with weighted earliness-tardiness penalty costs. Project activities are assumed to have a known deterministic due date, a unit earliness as well as a unit tardiness penalty cost and constant renewable resource requirements. The objective is to schedule the activities in order to minimize the total weighted earliness-tard...

2007
Jan Kelbel Zdeněk Hanzálek

This paper describes a constraint programming approach to solving a scheduling problem with earliness and tardiness cost using a problem specific search procedure. The presented algorithm is tested on a set of randomly generated instances of the job shop scheduling problem with earliness and tardiness costs. The experiments are executed also for three other algorithms, and the results are then ...

Journal: :journal of optimization in industrial engineering 0
behrouz afshar nadjafi department of industrial engineering, islamic azad university of qazvin, qazvin, iran, shahram shadrokh department of industrial engineering, sharif university of technology, tehran, iran,

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :Mathematical and Computer Modelling 2006
Gur Mosheiov Daniel Oron

In the scheduling problem addressed in this note we have to determine: (i) the job sequence, (ii) the (common) due-date, and (iii) the location of a rate modifying (maintenance) activity. Jobs scheduled before (after) the due-date are penalized according to their earliness (tardiness) value. The processing time of a job scheduled after the maintenance activity decreases by a job-dependent facto...

Journal: :Operations Research 1997
Awi Federgruen Gur Mosheiov

In this paper we consider single machine scheduling problems with a common due-date for all jobs, arbitrary monotone earliness and tardiness costs and arbitrary breakdown and repair processes. We show that the problem is equivalent to a deterministic one without breakdowns and repairs and with an equivalent cost function of a job's completion time. A V-shaped schedule without idle times is show...

2008
H. Allaoui

This paper focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance in a single machine subject to breakdowns. The objective is to minimize expected total earliness and tardiness costs with a common due-date. The problem of scheduling only n jobs to minimize total earliness and tardiness costs in a single machin...

Journal: :Journal of Industrial and Management Optimization 2023

This paper investigates the single-machine due-window assignment scheduling with truncated learning effects and past-sequence-dependent setup times simultaneously. The scheduler has option of job-rejection, i.e., some jobs are processed other rejected. Under three (i.e., common, slack different) methods, our goal is to minimize sum a general earliness-tardiness cost weighted earliness-tardiness...